Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

November 17, 2023

No Information to Display

Twp Rd 130B Rd

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Twp Rd 130B Rd, Vauxhall, AB

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Phase 2 is the enlargement of 4.5 km of existing TID canals from Horsefly Reservoir to Taber Lake, and construction of a wetland at Taber Lake. Phase 3 is the enlargement of 3.9 km of existing SMRID canals from the SMRID Main Canal to Horsefly Reservoir and construction of a wetland at the inlet to Horsefly Reservoir. After all three phases are complete 55 m3 /s will be diverted from the SMRID Main Canal to the Oldman River during storm events. TIMELINE: Engineering design is underway. Construction of phase 1 is about 60% complete.(project followed separately). Tender for construction of phase 3 may be issued in fall 2023 pending final approvals. Total cost for Phase 1 has been estimated at just over $22 million. Future phases of this project are being followed separately. Contributions include $7.4 million through the Alberta Communities Resiliency Program (ACRP) Fund by the Province of Alberta and $8.8 million through the Investing in Canada Infrastructure Program (ICIP) by the Government of Canada.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.