Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 14, 2022
November 14, 2022
No Information to Display
1401 Bank St
Renovation
No Information to Display
No Information to Display
Public - State/Provincial
1401 Bank St, Cincinnati, OH
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
The Southwest Ohio Regional Transit Authority (SORTA) is seeking bids for the replacement of all the Queensgate facilities overhead garage doors, controller, sensors, reflectors. Deadline to Submit Questions: 2:00 Pm on September 16, 2022 (Est) Addendum/response to Questions/clarifications Issued: September 22, 2022 The Southwest Ohio Regional Transit Authority (SORTA) is seeking bids for the replacement of all the Queensgate facilities overhead garage doors, controller, sensors, reflectors, along with utilizing the existing installed inground wire loops but adding one (1) manual on-off switch so ground loops can be deactivated individually. Any damaged, or missing, ground loop caulking shall be replaced. Queensgate division currently consists of 106 garage doors in total. See Scope of Work. Below is the location and address where the replacements shall be performed: o Queensgate (QG) Operating Division - 1401 Bank St., Cincinnati, OH 45214 The garage doors shall be replaced in four phases: schedule for installation of garage doors over the next four phases is as follows: PHASE 1 Replace (10) 14'x22'2" garage doors PHASE 2 Replace (32) 14'x22'2" garage doors PHASE 3 Replace (32) 12'x 14' garage doors PHASE 4 Replace (32) 12'x 14' garage doors The Queensgate facility currently has 60 14' x 22'2" Steel form standard (S24) white insulated (Raynor) garage doors; these are the bus parking bay doors. There is an additional 46 12' x 14' Steel form standard (S24) white insulated (RAYNOR) garage doors; these are the bus service garages. The project scope shall be the replacement of all exterior wall existing overhead doors and removal of all existing overhead doors and accessories. All Wash Bay Doors, Equipment and Materials shall be designed for WET LOCATIONS. Contractor shall be responsible for confirming all opening dimensions prior to submitting a response to this request and confirm all equipment will fit all spaces prior to ordering. Contractor shall remove and legally dispose of all demoed materials except for all springs and solid shafts. All removed springs and solid shafts shall be placed, by contractor, in a recycling dumpster provided by the owner and become property of the owner. Project area shall be swept clean at the end of each work shift. After removal of door frame mounted angle all exposed rust shall be ground smooth, and area painted with a Rust Converter metal primmer such as "Corrosseal" or equal. Any area the requires patching beyond rust removal shall be brought the owner's attention upon discovery. The removal of any existing Fire Suppression hanging brackets along with Sprinkler Head protection shall be by others and is not part of this request. However, if during the process of completing this project the door installer, or any of his sub-contractors, damage any part of the existing Fire Protection System the door installer shall be responsible for all direct and indirect damage repair and clean-up. The owner will supply a laydown area for the contractors use on the property. All electrical work required to provide fully functional doors as requested is to be included. If the temperature is projected to be below 40 degrees Fahrenheit while a door is removed the opening is to be covered to prevent building heat loss. Sensors shall be set/installed to prevent a door from closing on a 2 nd bus existing the building directly behind the bus that activated the overhead door initially. Upon completion of each phase of the project the full warranty period for all equipment installed during the phase shall begin. Upon completion of each phase owner training shall be provided along with all warranties, parts list and manuals submitted to the owner. A written schedule per phase shall be submitted to the owner for approval prior to any work beginning. An ADD alternate per door each to upgrade to a High-Speed door shall be supplied in response to this request
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Cincinnati, OH
Bid Date: Nov 30 2021
Cincinnati, OH
Bid Date: Oct 01 2021
Cincinnati, OH
--
Cincinnati, OH
Bid Date: Jun 03 2022
Cincinnati, OH
Bid Date: Oct 22 2021
Cincinnati, OH
--
Cincinnati, OH
Bid Date: Aug 28 2023
Cincinnati, OH
--
Cincinnati, OH
Bid Date: Jun 09 2023
Cincinnati, OH
Bid Date: Aug 04 2023
Cincinnati, OH
Bid Date: Aug 28 2023
Cincinnati, OH
Bid Date: Oct 06 2023
Cincinnati, OH
Bid Date: Aug 09 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
