Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 6, 2023

March 1, 2024

May 15, 2025

To Be Determined

Demolition, New Construction, Paving, Site Work

No Information to Display

$2,883,500.00

Public - City

img_map_placeholder

To Be Determined, Saint George, ME

Subscribe to View Full Documents

Project Description: construction of a new Classroom building at location indicated on Drawings. Work includes but is not limited, to site demolition, earthwork, site utilities and site improvements, paving and landscaping. Work also includes concrete foundations and slab-ongrade, wood structure, wood trusses and decking, asphalt shingle roofing, sheet metal flashing, wood stud partitions, insulation, gypsum board walls and ceilings, ceramic tile, acoustical ceilings, resilient flooring, carpeting, custom cabinets and fixtures, carpentry, aluminum entrances, aluminum-clad wood windows, painting, metal doors, wood doors, metal frames, door hardware, toilet accessories, signage, security systems, electrical, and heating, ventilating, and air conditioning complete and ready for use. The owner reserves the right to waive all formalities, and reject any and all proposals, or to accept any proposal. Any proposal that contains an escalation clause will be invalid. All telephone calls and correspondence in connection with this Project will be addressed to the office of the Architect, Attention: Jason Merriam, Merriam Architects, 58 park Street, Suite 102, Rockland, ME 04841. TEL 207-5941421 E-MAIL jason@merriamarchitects.com. Estimated budget is between $1.2-1.5 million. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 08/25/2023 at 5:00 PM ET

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.