Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 15, 2022

October 17, 2022

No Information to Display

Algerie Rd

Paving, Site Work

No Information to Display

$428,444.00

Public - City

img_map_placeholder

Algerie Rd, Blandford, MA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Bid prices shall include all labor, equipment and material for a complete in place product at Algerie Road. Bid prices are to be based on FDR with calcium, application of HMA Binder & Top mix along with Tack coat in between courses. The project consists of one section 7100' in length by 23' in width totaling approximately 18,144 Sq. YDs FDR of the existing blacktop surface, calcium chloride at a rate of 1 Gal. per sq. yard, and the application of a HMA 3/4 " Binder course of two inches and HMA top course of one and a half inches approximately 3,556 tons. Tack coat at a rate of .05 gallons a square yard in between courses along with a Wedge joint to be installed on both layers of HMA as well. Traffic control to be provided by winning bid contractor. The base price for liquid asphalt at this time is $787.50 per ton and the base price for diesel is to be determined. Price adjustment clause in effect for hot mix asphalt mixtures. Bids are to include base price of liquid asphalt and diesel and must be OSHA 10 certified. Project to be completed per current Mass DOT specifications. Project to be bid as one package. Prevailing wage applies as per M.G.L. Chapter 149, Section 26 to 27F and a wage schedule is included in the specifications. A 100% performance bond is required of successful bidder, 5% bond required with bid. Questions may be directed in writing to Highway Superintendent Derek Poirier at email highway@townofotisma.com no later than three days before opening date. The Board of Selectmen reserve the right to waive any informality or to accept or reject any or all bids deemed to be in the best interest of the Town.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.