Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
No Information to Display
September 14, 2023
No Information to Display
1 William L Jones Dr
New Construction, Site Work
No Information to Display
No Information to Display
Public - State/Provincial
1 William L Jones Dr, Cookeville, TN
Tennessee Tech University, on behalf of the State of Tennessee, has issued this RFQ to obtain a Designer interested in providing full design services for programming, design, contract documents, and construction administration of the Advanced Construction and Manufacturing Engineering Building project. TTU intends to enter into an agreement with a Designer that will deliver design services enabling construction of a facility having the highest possible quality within the available funding and the required schedule. Qualifications Statements in response to this RFQ shall be submitted in accordance with the requirements provided herein. The proposed Advanced Construction and Manufacturing Engineering Building (ACME), envisioned as a three-story structure with approximately 80,000 gross square feet, would be located on the northwest corner of Wings Up Way and Stadium Drive. An adjacent Foundry, connected to the main building, will be approximately 6,000 square feet. Instructional programs in advanced manufacturing, construction, robotics, mechatronics, concrete, industrial assessment, metals, plastics and HVAC will be housed there. Many of these programs will be relocated from Lewis Hall, the Foundry and East Stadium. Lewis Hall, the Foundry and a small gas storage building between the two will be demolished, and that site will return to green space. An underground chilled water line parallels and is adjacent to the north and east walls on the exterior of Lewis Hall, and it must remain active during demolition. A steam and condensate line pass through the crawl space in Lewis Hall. These must be disconnected prior to the demolition of Lewis Hall, then reconnected with new lines once demolition is complete. The targeted construction cost, including demolition and utility relocations, is $50,284,700 with a maximum allowable construction cost of $52,844,175. The total project cost is estimated at $62,400,000. Design firms will be retained and will operate under standard Tennessee Tech University Office of Capital Projects and Planning procedures, State Building Commission policy and Designer A Construction Manager / General Contractor (CM/GC) method of construction delivery is proposed for this project. The designer will participate as an advisor in the selection of the CM/GC, and will coordinate and work with the CM/GC to deliver a project in compliance with the program and within the funding allocated for the project. As a part of basic services, the designer will provide a workable basic layout of furnishings. Final design and specifying interior furnishings are not a part of basic services. Written Question Deadline 4:30 p.m. 8/26/2022 TTU Responds to Written Questions 8/31/2022 TTU Evaluation Complete 10/19/2022 Finalists for Interview Notified 10/20/2022 Designer Short List Interviews 10/31/22-11/2/22 Information Available for State Architect 11/11/2022 Executive Subcommittee of the State Building Commission 11/21/2022 The method of contractor selection has not been determined at this time.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Cookeville, TN
Bid Date: Sep 07 2023
Cookeville, TN
Bid Date: Aug 18 2023
Cookeville, TN
Bid Date: Oct 06 2023
Cookeville, TN
Bid Date: Oct 18 2023
Cookeville, TN
Bid Date: Oct 25 2023
Cookeville, TN
Bid Date: Oct 12 2023
Cookeville, TN
Bid Date: Oct 19 2023
Cookeville, TN
Bid Date: Jul 25 2023
Maryville, TN
Bid Date: Aug 18 2023
Knoxville, TN
Bid Date: Jul 31 2023
Bartlett, TN
Bid Date: Sep 05 2023
Farragut, TN
--
Brentwood, TN
--
Nashville, TN
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
