Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 16, 2023

September 15, 2023

December 14, 2023

Multiple Locations

Site Work

No Information to Display

$609,892.00

Public - City

img_map_placeholder

Multiple Locations, Henderson, NV

Subscribe to View Full Documents

The project consists of railroad track rehabilitation activities including cross tie removal and replacement, additions or replacement of railroad track appurtenances, ballast removal and replacement and erosion control measures for culverts and embankments. The project is located between the I-11 and I-215 interchange and Paradise Hills Road in the City of Henderson, Nevada. The CITY reserves the right to waive any informality or irregularity in any Bid received, to reject any or all Bids, and to re-bid Surety companies executing bonds must be licensed to issue surety by the State of Nevada Insurance Division pursuant to Nevada Revised Statutes 683A.090 and issued by an appointed agent pursuant to Nevada Revised Statutes 683A.280 This is a prevailing wage project and the CONTRACTOR and Subcontractors shall be bound by and comply with all federal, state and local laws with regard to minimum wages, overtime work, hiring and discrimination. The CONTRACTOR shall conform to the provisions of Nevada Revised Statutes Chapter (NRS) 338 relative to workmen employed on Public Works projects, except that the CONTRACTOR shall pay prevailing wage rates established by the Nevada State Labor Commissioner to workmen engaged in the performance of this project. The work also covers the installation of street lighting, traffic signals and intelligent transportation systems and all associated work. Removal and discarding of all packaging and waste materials related to the above scope of work, excluding demolition waste. All work, including medium voltage (15KV), of joining, splicing, and insulating, and the placing of flame proof covering where wiped lead joints are necessary, shall be performed by cable splicers. Journeymen only shall be used in assisting cable splicers. Cable splicers shall not be required to work on wires or cables where the difference in potential is over three hundred (300) volts between any two (2) conductors or between any conductor and ground, unless assisted by another journeyman. In no case shall cable splicers be required to work on energized cables carrying in excess of four hundred and forty (440) volts. A certified or cashier's check or bid bond accompanying the bid in the amount of 5% of the Total Bid Price payable to the CITY as a guarantee that the Bidder, if its bid is accepted, will promptly execute the Agreement, and provide the necessary bonds, insurance certificates and other required documentation Question Deadline 08/08/2023 at 8:00 PM PT

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.