Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

August 5, 2024

No Information to Display

Dudley Rd & Fountain St

Paving, Site Work

No Information to Display

$3,880,000.00

Public - City

img_map_placeholder

Dudley Rd & Fountain St, Framingham, MA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

This project is included in the City of Framingham 2024-2028 Capital Improvement Program (CIP). As of October 24, 2023, further details regarding design and construction have not been identified. A firm timeline for construction has not been established; however, funding is being allotted to fiscal year 2024. A detailed scope has not yet been determined. This is for the final design, permitting, and easement acquisition portion of the project, prior to construction. This well-traveled intersection is in need of upgrades to improve efficiency and vehicular and pedestrian safety. The traffic signals were intended to only be temporary but have been in place for many years and do not meet current standards. Furthermore, Farm Pond is classified as an Impaired Water Body, and improvements to the drainage system will enhance water quality. Features of the project will be the addition of a right-turn lane onto Dudley Road, improved intersection geometry, increased lengths of existing turning lanes, new pedestrian crossings, new traffic signals, and modifications to drainage to the outfall at Farm Pond. This project will complete the upgrades for Fountain Street and Dudley Road, which have included new water and sewer mains, drainage and roadway improvements, new Fountain Street and Winter Street Bridges, upgrades to Loring Arena, the dog park, the skate park, and the new Dudley Road multi-use path. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.