Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

April 19, 2023

May 19, 2023

September 15, 2023

102 Carlisle Ave

Renovation

No Information to Display

No Information to Display

Public - County

img_map_placeholder

102 Carlisle Ave, Greensburg, KY

Subscribe to View Full Documents

Bid Security equal to 5% of Base Bid will be required, in the form of a Bid Bond, Cashiers Check, or Certified Check. Questions or requests for clarification shall be directed to the Architect. The Owner reserves the right to reject any and all bids or to waive any informalities in the bidding. No bid may be withdrawn without the consent of the Owner or forfeit of Bid Security for a period of thirty (30) days subsequent to the date for receipt of bids. This branch of the work includes coordination with all utility companies; agency review fees and all inspection fees; all labor, materials, tools, excavation and backfill and all equipment necessary for the installation of all Heating, Ventilating and Air Conditioning, System as shown on the Drawings and Specifications and/or as required for complete and operating systems. The work shall include starting, balancing, and the necessary and required tests to insure the proper operation of the complete system. B. All work for this project must comply and be in strict accordance with the Kentucky Building Code, Kentucky Plumbing Code, Kentucky Boiler Code, NFPA, ADA, NEC and all local codes and regulations. C. In general (as a minimum) all materials and equipment must be installed in strict accordance with manufacturer's requirements; and provided with all required controls, internal fusing, relays, piping connections, electrical connections, ductwork connections, etc., to provide for complete and operable systems. The Architect and Engineer do not define the scope of individual trades, Sub-Contractors, material suppliers and vendors. Any sheet numbering system or specification numbering system used which identifies disciplines is solely for the Architect and Engineers convenience and is not intended to define a Sub51 Contractors scope of work. Information regarding individual trades, Sub-Contractors, material suppliers and vendors may be detailed, described, and indicated at different locations throughout the Contract Documents.

28 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects