Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
No Information to Display
February 23, 2024
No Information to Display
1500 E Ferry St
Site Work
No Information to Display
$500,000.00
Public - State/Provincial
1500 E Ferry St, Detroit, MI
We’ve obtained documents for this project and are currently processing them.
As of October 17, 2023, an engineer has been selected for the project. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: Depending on the project location, individuals may be required to wear masks to attend meetings and for a firm to be eligible to submit bids / quotations / proposals. Bring and be prepared to wear a mask if required upon arrival. Requirements may change at any time and any updated guidance must be followed. The Michigan Department of Transportation (MDOT) in partnering with the Department of Technology, Management and Budget (DTMB) is seeking the services of a professional engineer to provide design and construction management services to address the combined storm - sanitary sewer system backflow issue at the MDOT Detroit Garage. During heavy rain conditions, the floor area of the MDOT cold storage building (32,000 SF + / -) becomes flooded and creates a potential safety hazard. See attached photo(s) for the severity of the building floor flooding. The combined storm - sanitary sewer system locate don-site is to be redesigned as needed to accommodate a 100-year storm and to eliminate all backflow and flooding issues. A detention pond most likely will be needed to provide an acceptable influent rate to the City of Detroit combined storm - sanitary sewer system. Active communication with the City of Detroit will be expected to produce a final solution. In 2003, an Environmental Site Assessment (ESA) Phase I was performed and indicated potential on-site soil and groundwater contamination. Therefore, ESA Phase II is required due to future construction activities. The attached documentation includes but is not limited to: Corby Energy (and Spicer Group) Stormwater Drainage Report and related items (survey information, storm sewer cleaning and videoing information, calculations, etc.), Environmental Site Assessment (ESA) Phase I will be made available to the selected professional to use at their own discretion for the project. Phases - Deliverables: Combine Phases 100 through 500 as you see fit. Provide complete calculation at the end of Phase 500. Design Meetings: o Kickoff First Meeting - At Site o 30% - First Deliverable with Cost Estimates. Meeting will be online using Microsoft TEAMS o 75% - Second Deliverable with Cost Estimates. Meeting will be online using Microsoft TEAMS o 95% - Third Deliverable with Cost Estimates. Meeting will be online using Microsoft TEAMS o 100% - The final meeting deals with specifications and front-end bidding documents. Plan on at least two (2) hours for this call. Allocate $20,000.00 for communications with the City of Detroit. This allowance is also to cover the cost to be paid to the City of Detroit to jackhammer concrete in MH 1105. Each proposer to present their own work schedule. For bidding and contracting, assume three (3) months from the time plans and specifications are 100% complete to the time when the Pre-Construction meeting is held. Please do not submit online questions via VSS. ALL questions should be emailed to Chris Bahjet at bahjetc@michigan.gov address no later than 2:00 p.m., Eastern on Tuesday, September 6, 2022. The method of contractor selection has not been determined at this time
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Detroit, MI
Bid Date: Nov 03 2023
Detroit, MI
Bid Date: Oct 13 2023
Detroit, MI
--
Detroit, MI
Bid Date: Nov 08 2023
Detroit, MI
Bid Date: Oct 27 2023
Detroit, MI
Bid Date: Jan 18 2023
Detroit, MI
Bid Date: Nov 10 2023
Detroit, MI
Bid Date: Nov 01 2023
Detroit, MI
Bid Date: Oct 17 2023
Detroit, MI
Bid Date: Oct 30 2023
Detroit, MI
--
Detroit, MI
--
Detroit, MI
Bid Date: Oct 12 2023
Detroit, MI
Bid Date: Oct 10 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
