Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 1, 2022

October 3, 2022

No Information to Display

Multiple Locations

Renovation

No Information to Display

$156,890.00

Public - City

img_map_placeholder

Multiple Locations, Celina, OH

Subscribe to View Full Documents

North State Route 127 and Walnut Substation 13.2kV Distribution Improvements The proposed Work consists of furnishing all labor, supervision, tools and equipment to complete the project scope as follows: The City of Celina is improving two (2) sections of their existing 13.2kV distribution system, SR127 North and Walnut Sub Feeder. The construction at SR127N will include the installation of new poles, conductor, crossarms, insulators and miscellaneous Items of construction. The construction on the Walnut Sub Feeder will utilize the existing conductor. All material will be supplied by the City of Celina. For technical questions contact Joe Franczak, jfranczak@gpdgroup.com. You must contact the Engineer's Office to be a registered bidder. Only proposals submitted by registered bidders will be accepted. Each bid shall contain the name of every person, firm or corporation interested in the same, and must be accompanied by either a bid guaranty bond to the satisfaction of the City, or a certified check drawn on a solvent bank, in the sum of 10% of the bid, made payable to the City of Celina, Ohio, as a guaranty that if the bid is accepted, a contract will be entered into and its performance properly secured. In lieu of a "bid bond/, a certified check, on a solvent bank, made payable to The City of Celina, in the sum of ten percent (10%) of the total amount of the bid will also be accepted as a guarantee that If the bid is accepted, a contract will be entered into. The successful bidder will be required to post a performance payment bond in the amount of one hundred percent (100%) of the total amount of the contract awarded. No bidder may withdraw his bid for a period of 60 days after the scheduled closing time for the receipt of bids, The City of Celina, Ohio, reserves the right to reject any or all bids and to waive any irregularities In bidding.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.