Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 9, 2022

September 26, 2022

July 31, 2024

To Be Determined

Site Work

No Information to Display

$11,470,000.00

Public - City

img_map_placeholder

To Be Determined, Conneaut, OH

Subscribe to View Full Documents

The project is located at the Canadian National Railway Company's railyard, 950 Ford Avenue, City of Conneaut, Ashtabula County, Ohio 44030. The project is generally located south and west of Conneaut Creek on a 35.817 Acre leased area of the former Lower Coal Dock #3. This project includes work associated with the Conneaut Creek Dredge Reclamation Facility Site Improvements for the construction of a new sediment processing and management facility for receiving and management of dredged material and associated water from Lake Erie and Conneaut Creek. Both hydraulically and mechanically offloaded fine- and coarse-grained dredged material will be accepted and processed. A sluiceway system will manage hydraulically offloaded dredged material and silt management cells will manage mechanically offloaded dredged material. Work includes construction of aggregate access roads and drives, clay cap liner, containment berms, inlet and outlet control structures, storm sewer pipes and forcemain, and sluiceway system in accordance with the plans and specifications. There are two contracts in the bid documents for the same work. Contract A is to complete all work and ready for receipt of dredged material by July 31, 2023. Contract B is to complete all work and ready for receipt of dredged material by July 31, 2024 with Restoration within 90 days of Substantial Completion. The bidder may bid either contract or both. A separate bond must be submitted for each contract bid. All questions during bidding should be addressed to Gene E. Arters, P.E., who can be reached at 330-375-0800 ext. 647. Bid Results :: Contract A :: Independence Excavating, Inc. :: 11,220,000 Contract B :: Independence Excavating, Inc. :: 10,100,000

19 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.