Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 10, 2023

September 25, 2023

November 19, 2024

I-376

Paving, Site Work

No Information to Display

$8,345,457.00

Public - State/Provincial

img_map_placeholder

I-376, Shenango Township, PA

Subscribe to View Full Documents

For the Asphalt Milling and Resurfacing, Bridge Preservation, Sign Structure Preservation, Guide Rail, Drainage, Signing, Pavement Marking/delineation, and Other Miscellaneous Construction, All Within a Length of 14,326 Linear Feet (2.73 Miles) as Indicated on the Approved Drawings in the Bid Package for State Route 0376 Section L08, State Route 0422 Section L38, and State Route 3010 Section L06 in Lawrence County, Union Township, Commonwealth of Pennsylvania. This Project Being Situated as Follows: From a Point Approximately 2,490 Feet North of the State Street (Sr 0224) Overpass at Segments 0130/0131 Offsets 2068/2269 (Stations 604+37/601+78) to a Point Approximately 1,995 Linear South of Us 422 to Toll 376 at Segments 0144/0145 Offsets 3765/3477 (Stations 502+25/501+45). Project Cost Range: $7,500,000.00 - $9,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 26.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Resurfacing/overlays Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT -I-376, SR 224 to Turnpike *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects