Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 19, 2022

December 6, 2022

December 6, 2023

1200 Red Cleveland Blvd

New Construction, Site Work

No Information to Display

$3,000,000.00

Public - City

img_map_placeholder

1200 Red Cleveland Blvd, Sanford, FL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Sanford Airport Authority (Owner) requires a Design-Build Team (Respondent) to provide design and construction services for a new Maintenance Building on Owner property in Sanford, Florida in accordance with 287.055(9), Florida Statutes. When complete, the new building will be used for the daily operations of the Owner Maintenance Department. The objective of the RFQ is to identify and seek competitive qualifications from Respondents to provide services to design, permit and construct the new building in accordance with the design criteria package. The project can be generally described as: Design and construction of a 12,500 square feet of pre-engineered metal building and associated site improvements on an existing parcel of land at the Orlando Sanford International Airport. Work includes new building for office space, storage, and mechanics bay. Site improvements include parking, drive aisles, fence/walls, and landscaping. Renovation of the existing 6,000 square feet maintenance shed is included. The time of completion for the Maintenance Building - Design-Build project is anticipated to be 365 calendar days to achieve Substantial Completion. Clarification/Question Deadline August 9, 2022 @ 5 :00 p.m. Addenda Posted (Final) August 12, 2022 Clarification/Question Deadline September 23, 2022 Addenda Posted (Final) September 27, 2022 1st Evaluation Meeting October 17, 2022 @ 3:00 p.m. 2nd Evaluation Meeting (if needed) October 18, 2022 @ 3:00 p.m. Ranking Posted October 17 or 18, 2022 Ranking & Approval to Negotiate with Top Ranked Firm to BOD November 1, 2022 Contract Negotiation/Development November 2, 2022 through November 18, 2022 Recommendation to Award & Contract to BOD for approval December 6, 2022 The time of completion for the Maintenance Building – Design-Build project is anticipated to be 365 calendar days to achieve Substantial Completion

42 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.