Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 30, 2022

September 29, 2022

February 23, 2023

Quick Station Road

Paving, Site Work

No Information to Display

$4,378,450.00

Public - State/Provincial

img_map_placeholder

Quick Station Road, Smithers, BC

Subscribe to View Full Documents

The scope of work includes the removal of the existing Howe truss superstructure, raising of the pedestals, and the launching of a new Acrow superstructure. Scope further includes Quality Management, Environmental Mitigation, Mobilization/Demobilization, Site Clean-up and Restoration. The Site is located on Quick Station Road spanning the Bulkley River, approximately 25 km southeast of Smithers, BC, near the community of Quick, BC (54.61935, -126.89946). Documents can be obtained from www.bcbid.gov.bc.ca. Construction documents for this project are copyright of the Province of British Columbia.

84 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.