Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 1, 2024

November 15, 2024

June 30, 2026

36109 State Hwy 13

New Construction, Site Work

No Information to Display

$6,500,000.00

Public - Federal

img_map_placeholder

36109 State Hwy 13, Bayfield, WI

99

33

27

5

Subscribe to View Full Documents

Project number - 221151 The Work of the Project is defined by the Contract Documents and includes, but is not limited to, the following: a. The Work consists of two (2) new buildings for The Red Cliff Band of Lake Superior Chippewa located along State Highway 13 as well as access and utility services to the new buildings and other Work indicated in the Contract Documents. The purpose of the two (2) buildings is to house equipment and offices for the Red Cliff Transportation Department. b. Building 1 Scope: One-story new transportation facility that will contain offices, maintenance operations, and tempered garages. Building 1 contains two parts: (1) a pre-engineered metal building for vehicle storage and maintenance and (2) a sitebuilt slab-on-grade addition to the pre-engineered component intended for office use. The office includes a classroom space with a separate entrance. The scope includes all associated civil, mechanical, electrical, and plumbing to support the building described in this Manual and in the Drawings. c. Building 2 Scope: Erection of a pre-engineered metal building for vehicle storage. Structural components of Building 2 to be furnished by the Owner and erected by the Contractor. The scope includes all associated civil, mechanical, electrical, and plumbing to support the building described in this Manual and in the Drawings. Bid security shall be submitted with each bid in the amount of 5 percent of the bid amount. Est. Value: $ 6,500,000.00 Est. Completion Date: June 30, 2026 Owner reserves the right to reject any and all bids and to waive informalities and irregularities.

34 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects