Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 22, 2023

November 21, 2023

August 31, 2024

SR 287 and SR 79B

Paving, Site Work

No Information to Display

$8,900,000.00

Public - State/Provincial

img_map_placeholder

SR 287 and SR 79B, Florence, AZ

Subscribe to View Full Documents

Tracs No: 0000 PN FLO SZ04101C Project No: FLO-0(201)T Termini: Town Of Florence Location: SR 287 AND SR 79B Route No. Milepost District Item No. N/A N/A Southcentral Local The amount programmed for this contract is $$8,900,000. The location and description of the proposed work are as follows: The proposed project is located in Pinal County where SR 287 and SR 79B meet at the southern section of the Town of Florence. Approximate length of the project is 0.73 miles. The work consists of adding a new multi-lane roundabout at SR 287 and SR 79B and a single-lane roundabout at SR 79B and Florence Heights Drive. The time allowed for the completion of the work included in this contract will be 284 Calendar days. The Arizona Department of Transportation, in Accordance With the Provisions of Title Vi of the Civil Rights Act of 1964 (78 Stat. 252.42 U.s.c. 2000d-4) and the Regulations, Hereby Notifies All Bidders That It Will Affirmatively Ensure That Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full and Fair Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, or National Origin in Consideration for an Award. The minimum contract-specified goal for participation by Disadvantaged Business Enterprises in the work, as a percentage of the total amount bid, shall be 7.52 . This Contract Is Subject to the Provisions of Arizona Revised Statutes Section 42-5075 -- Prime Contracting Classification; Exemptions; Definitions. No Award Will Be Made to Any Contractor Who Is Not a Duly Licensed Contractor in Accordance With Arizona Revised Statutes 32-1101 Through 32-1170.03. All Labor Employed on This Project Shall Be Paid in Accordance With the Minimum Wage Rates Shown in the General Wage Decision. These Rates Have Been Determined in Accordance With the Requirements of the Law and Issued by the Secretary of Labor for This Project. The Wage Scale Is on File in Contracts and Specifications Section and Copies May Be Obtained at All Reasonable Times. A Proposal Guaranty in the Form of Either a Certified or a Cashier's Check Made Payable to the State Treasurer of Arizona for Not Less Than 10 Percent of the Amount of the Bid or in the Form of a Surety (Bid) Bond for 10 Percent of the Amount of the Bid Shall Accompany the Proposal. Surety (Bid) Bonds Will Be Accepted Only on the Form Provided by the Department and Only From Corporate Sureties Authorized to Do Business in Arizona. Questions and Comments Concerning the Bid Package for This Project Shall Be Directed to the Individuals Noted Below: Iqbal Hossain, P.e. Group Manager Contracts & Specification AZDOT - Construct Roundabouts - Sr 287 and Sr 79b Intersection Any questions received less than three working days prior to the bid opening date may not be answered.

23 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.