Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 10, 2023

January 23, 2024

August 1, 2025

1999 Singley Ln

New Construction, Site Work

No Information to Display

$34,000,000.00

Public - County

img_map_placeholder

1999 Singley Ln, North Charleston, SC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The work includes, but is not limited to, the construction of a new, two-story, fully sprinkled, 125,000 square foot building located on the existing Morningside Middle School campus (1999 Singley Lane, North Charleston, SC 29405). The facility will be composed predominantly of load bearing masonry veneered with utility brick and reinforced with structural steel, joists, trusses, and metal decking. The roof system is a 2-ply modified bitumen system. Mechanical system is an air-to-air direct expansion system with dedicated outdoor air units. Finishes will include but are not limited to: SVT, ceramic and quarry tile, sealed concrete flooring, carpet, acoustical ceilings, paint, casework, marker/tack boards, and kitchen equipment. The package includes an elevator, basic electrical services, life safety systems, information technology systems, and cable trays. Sitework is also part of this contract and consists of the installation of utilities, paving, sidewalks, curb & gutter, fencing, grassing and landscaping. Project will be required to be designed and constructed in accordance with CCSD's Educational Specifications and Design Requirements. The project will be constructed in a single phase with full project completion by no later than August 1, 2025. The work includes, but is not limited to, the construction of a new, two-story, fully sprinkled, 125,000 square foot building located on the existing Morningside Middle School. The scope will include masonry, roof systems, mechanical systems, finishes, elevator services, electrical services, and sitework.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects