Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 30, 2023

January 30, 2024

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$9,200,472.00

Public - City

img_map_placeholder

Multiple Locations, Malibu, CA

Our team is requesting plans for this project.

Subscribe to View Full Documents

SCOPE OF WORK : In general, the proposed improvements consist of median modifications for approximately 1 mile on Pacific Coast Highway between John Tyler Drive and Puerco Canyon Road. The improvements include modifying the existing curbed median by installing stamped concrete, roadway excavation, asphalt pavement, striping and signage, pavement markers, pavement markers and thermoplastic striping removal, new storm drain system, storm drain removal, adjusting utility covers, potholing, temporary traffic control, and all other appurtenant work included and shown in the Contract Documents and Specifications. The wage rate for any classification not listed by the California Department of Industrial Relations, but which may be required to execute the proposed contract, shall be in accord with specified rates for similar or comparable classifications or for those performing similar or comparable duties, within the agency’s determinations. The bid shall be submitted, and the work shall be performed by a Class “A” State of California licensed contractor in strict conformance with the project specifications for PACIFIC COAST HIGHWAY MEDIAN IMPROVEMENTS PROJECT – JOHN TYLER DRIVE TO PUERCO CANYON ROAD Specification No. 2049 now on file in the City’s Public Works Department. The City reserves the right to retain all bids for a period of 90 days after the bid opening date for examination and comparison and to delete any portion of the work from the Contract. The City reserves the right to delete any bid item to the extent that the bid is qualified by specific limitation. An unbalanced bid shall be considered as grounds for rejecting the entire bid. The City reserves the right to determine and waive non-substantial irregularities in any bid, and to reject any or all bids.

19 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.