Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 9, 2022

November 13, 2023

August 22, 2025

5500 Campanile Dr

New Construction, Site Work

No Information to Display

$40,000,000.00

Public - State/Provincial

img_map_placeholder

5500 Campanile Dr, San Diego, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

As of October 13, 2023, construction has not started. Project is scheduled to start construction next month. Some trade packages are still available to bid. The owner has selected a Design Builder.  The Project approximately consists of: The project will construct new standalone laboratory/lecture/research building to be named the IVC Brawley Lithium Research Hub / STEM Building (Academic Building II #102) located on a vacant development site on the IVC Brawley master plan. This project will provide a 43,000 ASF/66,000 GSF STEM research and instructional facility. The project will include lower division teaching labs, upper division teaching labs interdisciplinary lecture, 45 faculty/administrative offices, research and research services space, conference rooms, mechanical, electrical and telecom support spaces. Existing STEM programs at the San Diego main campus are severely impacted, and this new facility will expand access to both STEM and Engineering degrees to more students in the Imperial Valley region. To this end the facility will include 20,000 ASF of labs, core facilities with major instruments, and experimental fabrication space for collaborative work with public and private partners. - This direct construction cost budget includes the following; escalation, design contingency, furniture, fixtures & equipment; wayfinding signage; audio visual equipment. - The contract duration for the Phase 2 agreement is approximately 613 calendar days. The budget and duration will be established in the RFP. - The contract specifies that liquidated damages are $5,500 for each calendar day construction completion is late. - The Design-Builder is required to be licensed in the state of California with a B - license and registered to bid public works with the California Department of Industrial Relations (DIR). - The Design-Builder is required to be prequalified by the CSU Prequalification Program Administrator; refer to RFQ Section 4.

62 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects