Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 24, 2024

December 9, 2024

November 21, 2025

Cherry Run Rd

Demolition, New Construction, Paving, Site Work

No Information to Display

$2,500,000.00

Public - State/Provincial

img_map_placeholder

Cherry Run Rd, Toby Township, PA

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

This Project is the Bridge Replacement of the Existing Structure a Single Span Concrete T-beam Bridge That Carries Sr 2009 (Cherry Run Road) Over Cherry Run With a New Single Span P/s Concrete Beam Bridge That Has a Larger Hydraulic Opening, Slightly Higher Roadway Profile Improving Flood Water Passage, and Minimized Flood Impacts Thereby Providing Overall Increased Resiliency and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route 2009, Section 352, in Clarion County Toby Township From Approximately 500 Feet From the Start of the Existing Structure at Segment 0140 Offset 2862 to Approximately 500 Feet From the End of the Existing Structure at Segment 0150 Offset 0385. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 58.00% Let Type: Scheduled Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Replacement Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - SR 2009 Cherry Run Church Bridge *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects