Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 27, 2022

August 26, 2022

No Information to Display

To Be Determined

New Construction, Site Work

No Information to Display

$2,000,000.00

Public - City

img_map_placeholder

To Be Determined, San Francisco, CA

Our team is requesting plans for this project.

Subscribe to View Full Documents

Biosolids Digester Facilities - T-07.14: Exterior Skin Systems Supply and Installation This work will be performed at the Southeast Treatment Plant. This is an operating wastewater plant with extensive above- and below-grade infrastructure that must remain in continuous operation at all times. A brief description of the Scope of works This package includes the supply and installation of all glazing, curtain wall, skylight, and storefront assemblies interior and exterior for facility 615. Facility 615 is a 3-storey structure (approx. 39,000 sq ft) including channel glazing at the east and west stairwells, Storefront on the south side and windows on all sides. All aluminum window fins are included in this scope of work. All transom glazing embedded in door frames will be installed by others. Also included is all automatic doors, operators, actuators, and pedestals that fall within any storefront I glazing assembly. Additionally, please include all necessary and/or called out air barriers, membranes, caulking, and flashing for all glazing, curtain wall, and storefront assemblies interior and exterior for B615. Excludes electrical raceways and conduits required for automatic door assemblies (by others). Applicants who pre-qualify as Bidders are required to seek, and are encouraged to use, Disadvantaged Business Enterprises (DBEs) for their subcontracting and procurement needs. These requirements apply to all subcontracts for equipment, supplies, construction, and services. The SFPUC has adopted the following Fair Share Objectives for participation of DBEs in this SRF funded project. These are projectwide participation goals that the Contractor may seek to meet: 5.6% MBE 1.2% WBE . *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects