Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

July 21, 2023

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$3,500,000.00

Public - County

img_map_placeholder

Multiple Locations, Batavia, OH

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Bach Buxton Road Roundabout This project will involve the construction of a new roundabout on Bach Buxton Road which will allow continuous flow to/from the new Bach Buxton/SR 32 interchange (ODOT PID 103953 & 103954) while also providing access to adjacent developing properties. The proposed roundabout will be located in the general vicinity of the existing Provision Living facility at 4299 Bach Buxton Road. Design considerations should include providing access to Provision Living as well as the vacant properties on either side of Bach Buxton Road. No federal funds are associated with this project. Deerfield Road and Woodville Pike Roundabout This project will involve the improvement of the existing 4-way stop controlled intersection of Deerfield Road and Woodville Pike to reduce traffic congestion and increase safety. Consultant will prepare a brief evaluation of design alternatives prior to implementing design of these improvements. Construction funding has not yet been identified. Bach Buxton Road Roundabout PID: 90740 Estimated Construction Cost: $2,000,000.00 Deerfield Road & Woodville Pike Roundabout PID: 90750 Estimated Construction Cost: $1,500,000.00 Any questions shall be submitted by e-mail to Amanda Beiting at: abeiting@clermontcountyohio.gov. All questions will be answered in writing and posted electronically. No notification of responses will be made and interested parties must check the CCTID website for posted responses. The method of contractor selection has not been determined at this time

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects