Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 7, 2026

March 13, 2023

No Information to Display

2929 71st St

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

2929 71st St, Woodridge, IL

Subscribe to View Full Documents

**As of September 13, 2022, No definite date for the rebid.** The proposed work consists of furnishing all necessary labor (prevailing wage), materials, and equipment to complete culvert installation, rip-rap lining, earthwork, limited streambank and rock riffle stabilization. Offsite removal and legal disposal of designated trees, designated shrubs, and excess and/or unsuitable soils. Protection of existing wetlands and buffers, restoration of disturbed areas, native plant seeding, furnishing and installing live plant materials, and other items as listed on the project plans and specifications. The work shall include in the unit prices for each work activity any required excavations, backfill handling, stockpiling, and disposal. Project site, Hawthorn Hill Woods, located at 2929 71st Street in Woodridge, IL. All work as specified and in compliance with all applicable laws and codes. Upon staff receipt of your company's requested information, all necessary bid documents will be emailed at no cost, within two business days. For hard copy documents, a fee of $25 must be paid to the Woodridge Park District. Upon receipt of this fee, a complete hardcopy of the bid documents will be provided to the contractor for pick-up within two business days. For further information, contact Ryan Bordewick, Superintendent of Planning & Development at (630) 353.3300. Information (other than in the form of a written Addendum issued by the Park District) from any officer, agent, or employee of the Park District or any other person shall not affect the risks or obligations assumed by the Bidder or relieve him from fulfilling any of the conditions and obligations set forth in the bid and/or other contract documents. All Contracts for the Construction of Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12).

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects