Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 12, 2023

November 20, 2023

No Information to Display

Multiple Locations

Renovation, Site Work

No Information to Display

$250,000,000.00

Public - Federal

img_map_placeholder

Multiple Locations, Cherry Point, NC

Our team is requesting plans for this project.

Subscribe to View Full Documents

P-239, F-35 Flightline Utility Modernization Phase II, Marine Corps Air Station, Cherry Point, North CarolinaThis work includes P239 F-35 Flightline Utility Modernization Phase II, Design Bid Build, Marine Corps Air Station MCAS, Cherry Point. P-239 will upgrade, renovate, and modernize base utilities in the core area to servefuture airfield facilities. Utility work includes fire protection lines, potable water lines, communication fiber and duct bank, sanitary sewer, electrical distribution lines, substation upgrades, industrial wastewater lines, natural gas,and steam distribution. Project is considered Phase 2 of 2. The project will separate the fire protection system for the deluge sprinkler and existing aqueous film forming foam systems flight line buildings from the existing potablewater system. The new fire distribution system will include pipeline, fire pumps, fire pump buildings and water storage facilities. The potable water distribution system along A Street will be resized to correct the hydraulics andimprove water quality to the existing buildings. This project will also include new water service connections, advanced meters and the connection to the existing system along A Street. Elevated water storage tanks will berepaired and/or replaced to support the hydraulic changes. Communications pathways consisting of fiber, duct banks, manholes, and cable will be constructed along A Street. Infrastructure will be modernized to support ALIS.Provide hardware installation/replacement, new splices, expand vault and additional coring. Sanitary sewer system will be a gravity collection system to replace the aged wastewater collection mains, pump station and lift stations. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

34 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects