Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

October 2, 2023

No Information to Display

Multiple Locations

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Foster City, CA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

When the Government Center was constructed, signage was placed at the access points to the parking lot behind City Hall, the Police Station and the Fire Station to indicate that access was for authorized vehicles only. At that time, the possibility of future gate installation was considered likely. This project was originally scheduled for Fiscal Year 2018-2019, but was pushed back as the adjacent 15- acre site was developed and then the project was closed in Fiscal Year 2021-2022 due to revenue impacts of the Covid-19 pandemic. However, consistently over the years and in increasing volumes, staff has observed general public pedestrian and vehicle users accessing the driveway. With the occupancy of the 15-acres, even more throughway access has been observed. Security of this area is important for a number of reasons. Most significantly, pedestrians and unauthorized vehicles present a hazard to themselves and to public safety vehicles that are quickly departing the stations. In addition, this area is designated for parking for both City vehicles and 24-hour personnel that can be the targets of vandalism or theft of sensitive and expensive equipment. This project includes purchase and installation of the gates, loop detectors, UL-required safety devices and local controls as well as electrical and concrete work required to facilitate installation, which could include curb modifications, center island construction and trenching/back filling for power and control wiring. This Project Is included in the City of Foster City's FY 2022 - 2027 Capital Improvement Plan (CIP). Per the owner, as of August 1, 2023, this project is currently being assessed and prioritized. A timeline for design and construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.