Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 28, 2022

September 26, 2022

No Information to Display

FL-46

Site Work

No Information to Display

$4,113,089.00

Public - City

img_map_placeholder

FL-46, Sanford, FL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The Project replaces 8" C.I. Water Main (WM) which is located in the SR 46 travel lane with new 12" WM constructed outside of SR 46. The new 12" WM starts at 24th Pl./ US 17-92, extending east and south along 24th Pl., Oak Ave., 25th Pl. / Palm Dr., and Mellonville Ave., ending at the SR 46 / Mellonville Ave. intersection. The side street WM construction includes new 8" WM along Magnolia Ave., Palmetto Ave., Poinsetta Ave., Princeton Ave., Yale Ave., Orange Ave., Willow Ave., and Bay Ave. New 1"-2" PE WM is to be located along SR 46 under the sidewalk, reconnecting to water meters. Existing WM in SR 46 is to be taken out of service and grouted between Oak Ave. and Mellonville Ave. New WM construction includes open cutting approx. 5,320-ft of 12" PVC WM, 4,100-ft of 8" PVC WM, 315-ft of 6" PVC WM, and 3,300-ft of 1"-2" PE WM. Directional drilling includes approx. 2,680-ft of 12" PE WM, 3,370-ft of 8" PE WM and 800-ft of 2" PE WM. Jack and bore construction (186' of 20"-24" steel casing) is also included. This project is being supported, in whole or in part, by federal award number FAIN 1505-0271, awarded to the City of Sanford by the U.S. Department of the Treasury. Question End Date : 7/18/2022 5:00 PM

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.