Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 16, 2023

September 18, 2023

December 27, 2028

7800 Col. H. Weir Cook Memorial Dr

New Construction, Site Work

No Information to Display

$500,000.00

Public - City

img_map_placeholder

7800 Col. H. Weir Cook Memorial Dr, Indianapolis, IN

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Shortlist Confirmed. Terminal Connected Airport Hotel at the Indianapolis International Airport (IND) (Project No. I-21-060) The IAA is considering the development of a Terminal Connected Airport Hotel located on the west side of the existing Terminal Parking Garage. The current hotel program includes: 1. Approximately 250 keys 2. Full-service restaurant which serves breakfast, lunch and dinner 3. Pool and fitness center 4. Bar/Lounge area 5. Pedestrian passage through the hotel to the garage to serve Park & Walk customers. Pedestrian circulation will most likely include escalators/elevators and bridge to the garage. The bridge is expected to connect at the 3rd Level of the existing parking garage, i.e. uppermost portion of the speed ramp on the west side. The bridge is anticipated to be fully enclosed and terminate at the west exterior façade of the garage. 6. Page 15 of 19 depicts a conceptual level floor plan and elevations of the schematic design of the hotel. These drawings are meant to provide context of the type of hotel that is currently being considered. Additional information (i.e. Schematic Level design and renderings) will be shared prior to the Presubmittal meeting. 7. The RESPONDENT shall be familiar and have relevant experience in Hotel Development for Public Entities and Construction Manager as Constructor (CMc) delivery methods. The objective of this project is to design and construct a new Terminal Connected Airport Hotel Q&A Deadline: 04/21/2023 3:00 PM (EDT)

27 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects