Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 10, 2024

November 7, 2024

September 11, 2025

E Mesa Ave

Paving, Site Work

No Information to Display

$6,073,948.00

Public - City

img_map_placeholder

E Mesa Ave, Las Cruces, NM

69

8

11

4

Subscribe to View Full Documents

Reference Number 0000359387 The City Of Las Cruces Is Seeking Bids From Qualified Contractors For Roadway Reconstruction Services In Accordance With The Plans And Specifications Documents Contained Herein. Question Deadline 08/27/2024 at 2:00 PM MT Questions are submitted online No , Questions or clarifications related to the bid requirements will be addressed at this meeting and subsequent written a An acceptable bidder's bond payable to the City in an amount not less than five percent (5%) of the total for the bid submitted must accompany each bid as a guarantee that if awarded the contract, the bidder will promptly enter into a contract and execute such bonds as may be required. These Special Conditions, together with the accompanying documents and maps listed under SC-1 and the Referenced Specifications listed in these documents, cover the requirements for the work as listed in the bid, including incidental appurtenant work. The City reserves the right to shorten, add to, or change the list of work given below. It is intended, at this time, that the following work will be accomplished under this contract: The reconstruction of Cortez Drive from Porter Drive to Dunn Drive to include gas line connections, water and sewer utilities will be replaced/installed as a part of this project. Subsurface Storm drainage system will also be installed and surface drainage features with gravel, seeding and water retention. Street reconstruction includes new paving, curb/gutter and sidewalks, paved walking path, drive pads and ADA ramps as well as street lighting. A suggested phasing plan is included in the project plans, the contractor may work on different utilities (phasing) simultaneously with the express written permission of the City Project manager. The Contractor will be responsible for the additional traffic control to accommodate their build sequence, and this shall be done at no additional cost to the owner

52 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects