Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 28, 2022

August 8, 2022

April 5, 2023

NW 87th Ave

Site Work

No Information to Display

$797,552.00

Public - State/Provincial

img_map_placeholder

NW 87th Ave, Medley, FL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Counties: Miami-dade Road Name: Nw 87 Ave. Nb & Sb Over I-75 - Bridge No. 870600 & 871001 Limits: 87000030 Project(s): 44480525201(*) Federal Aid No: N/A Total Roadway Length: 0.060 Miles Contract Days: 240 Total Bridge Length: 0.120 Miles Total Proposal Length: 0.180 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 60 Electronic bids are requested for a contract that consists of Bridge-Painting along NW 87 Avenue Northbound and Southbound over I-75 at Bridge # 870600 and 871001 in Miami-Dade County. Prequalification is required For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 001 Bridge-Painting

37 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects