Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 19, 2022

September 1, 2022

April 1, 2024

1401 N. Parmer Ranch Boulevard

New Construction, Paving, Site Work

No Information to Display

$63,900,000.00

Public - City

img_map_placeholder

1401 N. Parmer Ranch Boulevard, Georgetown, TX

Subscribe to View Full Documents

https://www.mygovernmentonline.org/planning/ 2023-16-PFP Jurisdiction:Georgetown Create Date:09/18/2023 Business Steger Bizzell Engineering Applicant Kyle Miller Physical Address 1520 PATRIOT WAY 78626 GEORGETOWN, TX Mailing Address 1978 S Austin Avenue 78626 Georgetown, TX Description A Preliminary Final Plat Combo for a elementary and middle school site for GISD _________________________________________________ https://communityimpact.com/austin/georgetown/education/2023/01/16/georgetown-isd-to-build-three-facilities-ahead-of-2024-25-school-year-consider-bond-to-fund-more/ Georgetown ISD to build three facilities ahead of 2024-25 school year, consider bond to fund more With student enrollment expected to continue to increase over the next decade, Georgetown ISD is set to have three school buildings come online in the 2024-25 school year, with additional campuses to follow. Data from a demographics report by research firm Zonda projects GISD will educate an additional 3,100 students over the next five years and nearly 7,000 students in the next 10 years. This growth brings the challenge of ensuring the district has the right number of school sites in the right locations, Superintendent Fred Brent said. "You have new development that brings new construction that requires bond funds, and we also have to have bond funds to provide renovations ... to current facilities," he said. To keep up with capacity, the district is planning to open the new Benold Middle School in the 2024-25 school year, with construction on the $78 million project underway. Meanwhile, the district also has plans to open Elementary School No. 11 and the future-ready learning center that same year, all of which are funded through two of the five propositions from a 2021 bond election. The maximum price for Elementary School No. 11--which will be located in Liberty Hill's Santa Rita Ranch neighborhood--was set at $49.3 million. The $97 million future-ready learning center, going in at 5001 Airport Road, includes 241,209 square feet of space to house career and technical education courses, Richarte High School, and the Bridges 18+ program that serves students with special needs for up to four years after graduation. Brent said the district expects to call another bond in 2024 to fund future facilities. That package will likely include money for two elementary schools, one middle school and one high school. The new schools opening in 2024 will require some rezoning, Brent said, as Elementary School No. 11 aims to provide Wolf Ranch Elementary with some capacity relief. However, when GISD opens its third comprehensive high school by 2027, the district would undertake a large-scale master-zoning plan. "We try not to rezone too frequently, because we don't want to move families more than we have to," Brent said. __________________________ Plans call for the New Benold Middle School, located in the former Parmer Ranch development on the northeast corner of Ronald Reagan and Williams Drive with a 1,000 student capacity. The structures is two stories based on Wagner Middle School for GISD. To be considered for a contract, each proposal must submit and / or update the subcontractor qualification for accessible at http://bccenter.bartlettcocke.com/subcontractors/qualification_form Please DO NOT submit this with your proposal. **PLEASE DO NOT CONTACT THE OWNER NOR ARCHITECT FOR DOCUMENTS** *Addenda will only be published on the website of Huckabee (www.huckabee-inc.com). No addenda will be mailed or faxed to any planholder unless requested by the proposer. Proposers shall promptly notify the construction manager, in writing, of any error, ambiguity or inconsistency discovered upon examination of the proposal documents. Every request for an interpretation or substitution shall be make in writing and faxed or emailed to Bartlett Cocke, attention to Kevin Striedel. Fax: (512) 326-4339 or (512) 326-3990 or Email: kstriedel@bartlettcocke.com. All RFIs are due July 8, 2022 at 6:00 p.m. EDT The construction manager reserves the right to reject any or all proposals, accept proposal alternates in any order or combination, make modifications to the work after submission of proposals and waive any informalities or irregularities in proposals if it is deemed appropriate by the construction manager.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.