Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

March 1, 2024

October 1, 2025

Multiple Locations

Renovation

No Information to Display

$5,000,000.00

Public - County

img_map_placeholder

Multiple Locations, Batavia, OH

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

As of August 16, 2023, information regarding the award and award date has not been disclosed. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: Replace the roof on McDonough Hall with 2-ply modified bitumen roof system with cap sheet. Also replace the existing hot-water heat/DX cooling rooftop air-handling units with hot-water/chilled-water air-handling units. To accommodate the new air-handling units, route chilled water from the existing chilled water loop at the existing taps in the Snyder building. Underground pipe routing will be required. Upgrade the building automation system to Siemens and modify the existing terminal units to interface with Siemens. Submit the requested number of Statements of Qualifications (Form F110-330) directly to Patrick Daniels at Patrick.daniels@uc.edu. See Section J of this RFQ for additional submittal instructions Replace the roof on the Student Services Building with 2-ply modified bitumen roof system with cap sheet. Also replace the existing hot-water heat/DX cooling rooftop air-handling units with hot-water/chilled-water air-handling units. The accommodate the new air-handling units, extend the chilled water piping from McDonough Hall to the Student Services Building. Underground pipe routing will be required. Upgrade the building automation system to Siemens and modify the existing terminal units to interface with Siemens. A Construction Manager at Risk will be brought on board after the design development phase. Submit all questions regarding this RFQ in writing to Patrick Daniels at Patrick.daniels@uc.edu with the project number included in the subject line (no phone calls please). Questions will be answered and posted to the Opportunities page on the OFCC website on a regular basis until one week before the response deadline. The name of the party submitting a question will not be included on the Q&A document. Both buildings will be designed as a single project, but the work in each building will be performed in separate phases. The work is anticipated the be completed over two separate summer terms. A Program of Requirements will be provided by the University to the A/E prior to award. Upon award of the Agreement, the A/E shall perform program verification, including but not limited to estimate of probable cost, and commence with Design.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.