Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 14, 2023

August 30, 2023

September 28, 2027

Multiple Locations

Paving, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Port Angeles, WA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

This project will remove existing barriers to fish migration at the following US 101 & SR 116 stream crossings and replace with fish-passable structures in compliance with the federal injunction regarding fish passage underneath WSDOT highways Tumwater Creek (US 101 MP 246.4), Ennis Creek (US 101 MP 250.0), Lees Creek (US 101 MP 250.5) and Chimacum Creek (SR 116 MP 0.22). The Project will include providing water crossing and structure designs, plans, and specifications for the project, design documentation, hydraulic design documentation, stream restoration in the immediate vicinity of the crossings, as required and mitigation solutions for sensitive area impacts. Acquiring environmental permits as an authorized agent of WSDOT and facilitating temporary and permanent utility adjustment and relocation. Other elements include, but are not limited to, constructing embankments, structural shoring, creek channel grading & large woody material structures, paving and pavement marking, traffic control, stormwater catchment & treatment, guardrail, sidewalks & ADA, signing, signals & illumination, erosion control, and planting. A state and federally funded contract. DBE goals are to be determined. County Clallam County Jefferson County Estimated value $85,000,000.00 - $105,000,000.00 WADOT - RFQ D/B - US 101/SR 116 North Olympic Peninsula - Remove Fish Barriers *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Deadline for Submitting Proposer's Questions 5/24/2023

23 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.