Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

October 9, 2023

October 11, 2024

US-422

Paving, Site Work

No Information to Display

$7,500,000.00

Public - State/Provincial

img_map_placeholder

US-422, Butler, PA

Subscribe to View Full Documents

This is a Group Project That Includes Patching the Existing Concrete Four-lane Roadway and Overlay With Bituminous Binder and Wearing Courses, Updating Drainage and Guide Rail, Replacing Concrete Median Barrier, Preservation Work on Structure (S-40892), and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route 0422, Section 231, in Butler County in Butler, Franklin, Connoquenessing, Townships From Approximately Duffy Rd (Sr 3039) Overpass at Segment 0260 Offset 2899 to Approximately to Whipporwill Rd (Old Route 422/ T-439) at Segment 0320 Offset 2208. Also Included is Preventative Maintenance Paving of Sr 8008 Ramps Between Sr 356 and Us 422. Also Included Are the Bridge Repairs to the Existing Structure Carrying Sr 3031 (Lions Road) Over Us 422 Eastbound and Westbound in Butler Township, Butler County From Segment 0030 Offset 0000 to Segment 0030 Offset 2308. Also Included is the Rehabilitation of the Existing Structure S-41045, Which Includes the Deck and Super Replacement and Abutment Repair, Carrying Sr 3031 (Lions Road) Over Us 422 Eastbound and Westbound in Butler Township, Butler County. From Segment 0030 Offset 0541 to Segment 0030 Offset 0871. Project Cost Range: $5,000,000.00 - $7,499,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 9.00% Let Type: Scheduled Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Highway Reconstruction PennDOT - Butler Bypass Phase 2 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

19 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.