Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 16, 2022

August 1, 2022

December 12, 2023

PA-121

Paving, Site Work

No Information to Display

$7,417,590.00

Public - State/Provincial

img_map_placeholder

PA-121, Pittsburgh, PA

Subscribe to View Full Documents

The description and location of the project is as follows: For the milling, resurfacing, shoulder repair, concrete pavement patching, base repair, drainage, guide rail, pavement marking, and other miscellaneous construction, all within a length of 28,277 linear feet (5.36 miles) as indicated on the approved drawings included in the bid package for ALLEGHENY GROUP 111-22-7135-2 in ALLEGHENY COUNTY, MT LEBANON, SCOTT, SOUTH PARK, UPPER ST. CLAIR TOWNSHIPS and BETHEL PARK AND BRIDGEVILLE BOROUGHS, Commonwealth of Pennsylvania. This project being situated as follows: SR 0121, Section A22 (Cochran Road) - From the intersection of SR 0019 (Beverly Road & Cochran Road) and Beverly Road (TWP) at Segment 0010 Offset 0000 (Station 1+46) to Manorview Road (TWP) at Segment 0040 Offset 0600 and Segment 0041 Offset 0595 (Station 47+22). SR 2040, Section A28 (Broughton Road) - From the intersection of SR 0088 (Library Road) at Segment 0010 Offset 0000 (Station 0+00) to approximately 50 feet east of the intersection of Horning Road (TWP) at Segment 0064 Offset 0049 and Segment 0065 Offset 0049 (Station 127+62). SR 3005, Section A09 (Bank Street) - From a point approximately 100 feet south of the intersection of SR 3034 (Chartiers Street) at Segment 0050 Offset 2979 (Station 0+00) to the intersection of SR 3005 (Dewey Avenue) and Dewey Avenue (BORO) at Segment 0070 Offset 0100 (Station 35+03). SR 3052, Section A07 (Greentree Road) - From a point approximately approximately 350 feet west of the intersection of SR 3025 (Washington Street & Old Washington Pike) at Segment 0090 Offset 0258 and Segment 0091 Offset 0260 (Station 0+00) to the intersection of SR 0121 (Cochran Road & Greentree Road) at Segment 0150 Offset 1368 and Segment 0151 Offset 1277 (Station 78+83). Various State Routes and Facilities throughout Allegheny County for unforeseen repair and/or resurfacing, as directed. Project Cost Range: $5,000,000.00 - $7,499,999.99 Federal Project Status: Non - Federal (100% State) Structure Work: 0.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: RESURFACING/OVERLAYS 408 Version: 2020-4 PADOT - GRP 111-22-7135-2 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.