Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 14, 2022

February 1, 2023

No Information to Display

To Be Determined

Renovation

No Information to Display

No Information to Display

Public - County

img_map_placeholder

To Be Determined, Fort Wayne, IN

Subscribe to View Full Documents

**As of August 1, 2022, bids received were rejected. No definite date for the rebid** Preliminary results will be available on QuestCDN immediately following. These Specifications and the accompanying Drawings describe the Work to be done and the materials to be furnished for the construction of the Allen County Bud Meeks Lift Station Improvements 2022 project. The Contractor shall complete all work for completely functional street improvements as specified or indicated in the Contract Documents. The Work is generally described as follows: 1. Lift Station and Valve Vault Improvements a. Remove and replace existing pump discharge bases, grinder guide-rail support brackets, pump guide-rail upper support brackets, discharge piping, pipe supports, anchors, valves, drain pipe, pressure gauge assembly, and pipe accessories. Remove and replace buried discharge piping up to 5 feet outside of valve vault. Tie into existing PVC force main. b. Furnish and install retro-fit safety grate within existing wet well opening. c. Furnish and install new Macerator, guiderails, and controls. d. Protect equipment to remain, including (2) ABS Pumps and (1) Level Probe, along with their associated control wiring. e. Remove and properly dispose of solid materials within the wet well. Cleaning beyond removal of materials shall be sufficient for proper safety and quality of workmanship. f. Surface Restoration 2. Electrical Improvements a. Remove existing junction box within lift station b. Furnish and install pull box, junction box, and all associated conduit and wiring. c. Incorporate new macerator controls into existing electrical for a complete and functional system.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.