Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 16, 2023

December 18, 2023

No Information to Display

To Be Determined

Site Work

No Information to Display

$1,374,015.00

Public - City

img_map_placeholder

To Be Determined, Spokane, WA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

This project consists of the rehabilitation of the spillway concrete piers, repair of select cracks on the vertical faces of the piers and the abutment walls, demolition and replacement of pier extensions on the spillway hoist deck, repairs to the hoist deck concrete, installation of expansion joint seal assembly to seal a leaking vertical expansion joint on the spillway left abutment upstream guide wall, inspection and cleaning of the horizontal drains in the downstream left abutment wall and the OGEE drains in bay 7 and 8, Tainter Gate No. 5 structural repairs, replacement of both Tainter Gate No. 5 trunnion pins, and other related miscellaneous items. Cashier's check, a certified check or surety bond in the sum of five percent (5%) of the Total Project Bid must accompany the copy of the bid filed with the City Clerk. Successful bidder shall execute the Contract within TEN (10) calendar days after receiving the Contract. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated herein, the bid proposal deposit shall be forfeited to the City of Spokane. The City of Spokane will normally award this Contract or reject bids within FORTY-FIVE (45) calendar days after the time set for the bid opening. If the lowest responsible Bidder and the City of Spokane agree, this deadline may be extended. If they cannot agree on an extension by the 45-calendar day deadline, the City of Spokane reserves the right to Award the Contract to the next lowest responsible Bidder or reject all Bids. Point of Contact: jehansen@spokanecity.org

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.