Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 28, 2023

August 14, 2023

August 31, 2025

Gardiner Dam

New Construction, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Gardiner Dam, Parkside, SK

Subscribe to View Full Documents

The scope of the work is to provide all contracting services required to build and commission the new 72 kV Substation at East Side Pump Station: (a) Complete all earthworks, drainage, containment, and foundations, including construction of site access road. (b) Receive, inspect, accept, offload, protect, install and commission long-lead equipment purchased by WSA. (c) Supply all remaining materials and equipment necessary to build the substation. (d) Supply and install all structure and fabricated items for the new substation. (e) Supply, install, and complete any modifications to DC or 4160V gear within the pumphouse building. (f) Supply and install all auxiliary materials and equipment such as lighting, fencing, signage, grounding, lightning protection, small buildings, etc. (g) Coordinate, as required, with SaskPower for transmission line interconnection. (h) Participate in substation dry and wet commissioning with WSA, the Prime Consultant, Equipment Vendors, and SaskPower. (i) Once fully commissioned, demolish the existing substation including limited drilling and subsurface foundation removal. (j) Complete site restoration at both new substation and at post-demolition existing substation Question Deadline 05/29/2023 at 4:00 PM CT

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.