Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 26, 2022

June 27, 2022

September 26, 2022

To Be Determined

Paving, Site Work

No Information to Display

$3,125,980.00

Public - City

img_map_placeholder

To Be Determined, Dublin, CA

Subscribe to View Full Documents

***As of June 7, 2022 , this project has not yet been awarded. The project is expected to be awarded on June 21, 2022.** The Project is more specifically defined in the Contract Documents, but generally includes furnishing all labor, materials, tools, equipment, transportation, and services necessary to perform the construction and installation of the following: street resurfacing of Dublin Boulevard from Scarlett Drive to Hacienda Drive, including the installation of curb ramp replacement, cold planning and overlay, pavement marking, adjusting utilities to grade, and modifications to traffic signals, all as shown in the Specifications, Special Provisions, and other Contract Documents entitled as shown above, now on file in the office of the Public Works Director, to which reference is hereby made for further particulars. The City's estimated total construction cost for this Project is between - $3,000,000 and $3,500,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PROJECT SCOPE: The Project is more specifically defined in the Contract Documents, but generally includes furnishing all labor, materials, tools, equipment, transportation, and services necessary to perform the construction and installation of the following: street resurfacing of Dublin Boulevard from Scarlett Drive to Hacienda Drive, including the installation of curb ramp replacement, cold planning and overlay, pavement marking, adjusting utilities to grade, and modifications to traffic signals, all as shown in the Specifications, Special Provisions, and other Contract Documents entitled as shown above, now on file in the office of the Public Works Director, to which reference is hereby made for further particulars.

25 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects