Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

April 1, 2024

No Information to Display

To Be Determined

New Construction

No Information to Display

$21,700,000.00

Public - County

img_map_placeholder

To Be Determined, Conway, SC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

As of October 25th, 2023, this project is in the design phase. An architect and general contractor have been selected. Construction is anticipated to start in first quarter 2024. The scope of work is for the design and construction of two new Elementary Schoolsfor the Carolina Forest attendance area. They will be multistory designs, with a corecapable of supporting 1,200 students each. They will have the flexibility to be built withthe full student capacity, or a lesser 900 student capacity. The designs will be used asa prototype for each site. The full design and construction will be done under the IPD process.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.