Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 10, 2023

October 9, 2023

No Information to Display

3101 9th Ave Dr NW

New Construction, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

3101 9th Ave Dr NW, Hickory, NC

Subscribe to View Full Documents

The work of this project is defined by the Contract Documents and includes, but not limited to, the following scope: All labor, taxes, materials, equipment, services, permits, incidental and implied, to construct a new Aviation Museum and CVCC Education Center. The project consists of the construction of an airplane hangar of approximately 4,000 SF for the Museum, a 9,000 SF shell space for a future Restaurant/event space and an education center of approximately 36,000 SF for Catawba Valley Community College The scope of work per contract documents are as follows: David E. Looper & Company, Inc. would like to invite you to participate in the bidding process for this new Airport Aviation Museum/Hangar, University lab and classroom and 3 story office and restaurant shell space. This facility will be a combination of Pre-engineered Metal Building and 3 story structural steel structure with elevated concrete decks. The project will have the following; Sitework: Grading, paving, sidewalks, stained concrete, Landscaping, chain link fencing and gates, site lighting, dumpster pad, bollards, concrete paving, water lines, sanitary sewer lines, storm sewer lines Building: Concrete foundations, structural steel, steel stairs, Steel railings, Casework, caulking, TPO roofing, Insulation, aluminum composite panels, Curtain Wall, Storefront, doors, frames, hardware, OH doors, light gauge framing, drywall, polished concrete flooring, resilient flooring, ceramic tile, painting, toilet and bath accessories, toilet partitions, fire extinguishers and cabinets, PEMB (including standing seam metal roofing, aluminum siding panels, interior liner panels, insulation), Fire Sprinkler system, Plumbing, Mechanical/HVAC and Electrical. This a CMAR project for DELCO requiring all subcontractors to be prequalified. Please find the prequalification forms within and return them previous to or on or about the time you submit your bid to us. RFI Cutoff/Deadline is July 28th at Noon. *As of August 4, 2023, addendum 3 has been issued.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.