Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 22, 2023

October 23, 2023

June 10, 2024

43900 San Pablo Ave

Addition, Renovation, Site Work

No Information to Display

$9,300,000.00

Public - City

img_map_placeholder

43900 San Pablo Ave, Palm Desert, CA

Subscribe to View Full Documents

1. The work includes but is not necessarily limited to furnishing all: labor, materials and the installation of same, appliances, tools, equipment, facilities, transportation, receiving and unloading, hoisting, task lighting, applicable taxes and services necessary for, and incidental to, performing all operations in connection with this scope of work. 2. The breakdown of the scope of work by specifications is for organizational purposes only. The scope noted herein provides additional clarity only. It is not necessarily all inclusive. Where there is a reference to a detail, plan sheet or a note, this is to bring awareness only. Unless specifically excluded, this Contractor has the entire scope of work. 3. The scope noted herein; regardless, if duplicated in anothers scope of work and other contract documents, shall be included in this Category Contractors base bid. In the event a scope item is duplicated in another Contractors scope of work and/or and other contract documents, this does not relieve this Contractor from the responsibility of the scope. It shall be the Construction Managers discretion as to which Contractor will perform the scope of work and who shall provide a credit for the value of the scope not provided The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required. The Contractor shall recognize and perform in accordance with all stated intents, specifications and stipulations contained or referenced herein. Each bidder shall be responsible for researching the existing conditions and matters that affect the cost or performance of the services. Project Number - 544-1626423-04-217 Requests for clarifications, questions and comments must be submitted in writing via email to Kory Saldana at ksaldana@tilden-coil.com, cc: Julissa Ibarra at jibarra@drd.us.com, and must be received no later than 3:00 PM on Tuesday, August 2, 2023 This project consists of the renovation and addition to the existing Palm Desert Community Center with minor site work.

21 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.