Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 14, 2023

February 14, 2024

No Information to Display

To Be Determined

Renovation, Site Work

No Information to Display

$1,500,000.00

Public - City

img_map_placeholder

To Be Determined, Manteo, NC

Our team is requesting plans for this project.

Subscribe to View Full Documents

The Project includes the following Work: The work of this project includes all labor, tools, equipment, materials and supplies for the installation of an open channel, gravity flow, low pressure high intensity ultraviolet lamp (UV) treatment system complete with an automatic mechanical/chemical cleaning system and variable output electronic ballasts at the Town of Manteo’s existing Wastewater Treatment Plant (WWTP) to replace the plant’s existing chlorine disinfection. This project shall also include the demolition of the existing chlorine contact chamber’s baffle walls; partial removal of the structure walls between the chlorine contact chamber and post aeration basin; lowering of the effluent weir wall and replacement of the effluent weir; reinforced, cast-in-place concrete wall, slab and channel walls for the UV system, slide gates, structural steel framing, grating, stairs and handrails; site grading and sidewalk additions; demolition of the existing standby generator; permanent standby generator, automatic transfer switch; reinforced, cast-in-place concrete generator pad, site improvements; electrical; lighting; telemetry modifications, and all other items shown on the project drawings or included in the contract specifications. The Owner has developed a goal of ten percent (10%) for participation of minority-owned and womenowned business enterprises in construction contracts awarded pursuant to NCGS 143-128. Bidders must comply with the Owner’s requirements for W/MBE documentation. The Project has an expected duration of 240 days. The Owner reserves the right to reject any and all BIDS and to award both Parts, either Part or neither Part of this project.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.