Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 19, 2022

July 1, 2024

November 30, 2027

3700 Nassau Mills Rd

Demolition, New Construction, Site Work

No Information to Display

$50,000,000.00

Public - State/Provincial

img_map_placeholder

3700 Nassau Mills Rd, Peterborough, ON

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe to View Full Documents

The Peterborough Campus Residence/College Project is proposed to be constructed on an approximately 1.6 acres site located on the east bank of the Symons Campus, next to Otonabee College and near the Science Complex and the DNA building. The site features views of Otonabee River and is in close proximity to campus amenities such as student labs, classrooms, parking, food services, student services and college space. The legal address of the site is: 3700 Nassau Mills Rd, Part of Lot 7, Concession 10, Township of Douro, Peterborough, Ontario The Otonabee Student Residence Project will involve the development of a single-use student residence facility to replace the existing student residences that form part of the Otonabee College. It will involve the demolition of the existing student residence at the college and the construction of a new 500-bed (+/-) student residence facility. The University expects construction of the Otonabee Student Residence Project to commence in May 2027. Documents can be obtained at: https://trentu.bonfirehub.ca/opportunities/52447 TIMELINE: RFPQ 2021-144-TD has closed at the owner. Three (3) teams were short-listed as follows: Calibre Campus Partners (Fengate Capital Management); CCT Team - Campus Suites; and Knightstone Capital Management Inc. (Diamond Schmitt). The University is in negotiations with the preferred vendor; an award is expected by end of the calendar year. As of January 10, 2024, negotiations are ongoing for the final selection. Specific project timelines will be determined with the successful proponent. Further update Q2 2024.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects