Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 30, 2023

September 29, 2023

November 2, 2024

2601 Glencliff Dr

Renovation

No Information to Display

$85,000.00

Public - City

img_map_placeholder

2601 Glencliff Dr, Plano, TX

Subscribe to View Full Documents

Liberty Recreation Center Outdoor Repairs Provide all labor, materials, supervision, and equipment as necessary for turf area re-work, a new door to an existing exterior wall, and new gates to the existing dumpster enclosure. The location of this project is 2601 Glencliff Drive in the City of Plano, Texas. A location map is included in the plans. Contractors are required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. Additionally, Contractors are required to pay wages not less than once a week Question Deadline 08/17/2023 at 11:00 AM Submit all questions on the solicitation question portal on PlanoTX.ionwave.net by the Question Deadline. Answers will be provided via the IonWave interface or addenda on PlanoTX.ionwave.net. The City reserves the right to waive any minor defect, irregularity, or informality in any bid. The City may also reject any or all bids without cause prior to award. The City of Plano reserves the right to accept or reject any/all price escalations. The City of Plano reserves the right to audit the records and performance of Contractor during the contract and for three years thereafter. This project is estimated at $85,000.00. include a bid bond or a bid guarantee in the form of a cashiers check or certified check in an amount not less than five percent (5%) of the total maximum bid price Project TOTAL time is 400 calendar days. Response would be 380 calendar days to achieve substantial completion and 20 days to achieve final completion.

51 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.