Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 12, 2022

June 13, 2022

November 10, 2022

Multiple Locations

Renovation

No Information to Display

$178,000.00

Public - City

img_map_placeholder

Multiple Locations, Mansfield, TX

Subscribe to View Full Documents

A 300,000 Gallon Cardinal Oaks Ground Storage Tank Rehabilitation which includes recoating of the interior and exterior surfaces of the tank, miscellaneous structural modifications, replacing roof vent, and heat tracing of the pressure transmitter piping. Estimate: $100,000.00 - $150,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Please direct all questions related to the design of the Project to the Q&A Section. Penal Sum of Bond: 5% of Contract Price offered Furnish performance and payment bonds, each in an amount equal to the Contract Price, as security for the faithful performance and payment of Contractor's obligations under the Contract Documents. These bonds are to remain in effect until 1 year after the date of final payment. Owner reserves the right to reject any and all Bids, including non-conforming, non-responsive, or conditional Bids. The Owner may also reject the Bid of any Offeror if the Owner believes that it would not be in the best interest of the Owner to make an award to that Offeror. The Owner reserves the right to waive all formalities The deadline to ask questions is 5/06/2022 12:00 PM CST DESCRIPTION OF WORK A. Work is described in general, non-inclusive terms as: 1. 300,000 Gallon Cardinal Oaks Ground Storage Tank Rehabilitation which includes recoating of the interior and exterior surfaces of the tank, miscellaneous structural modifications, replacing roof vent, and heat tracing of the pressure transmitter piping. Multiple Locations Are Available In This Project.

59 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.