Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 17, 2022

July 25, 2022

No Information to Display

350 River Ridge Dr SE

Addition, Demolition, New Construction, Renovation, Site Work

No Information to Display

$112,140,000.00

Public - County

img_map_placeholder

350 River Ridge Dr SE, Lacey, WA

Subscribe to View Full Documents

** As of June 13, 2022, project has not been awarded yet. ** Briefly and without force and effect upon the Contract Documents, the Work can be summarized as: 1. Offsite and onsite utilities. 2. Demolition (of approximately 101,000 sf) and hazardous materials removal. 3. Modernization (of approximately 80,000 sf) and new construction (of approximately 121,000 sf). 4. Site work and sports fields. 5. Site preparation and utility connection for portable classroom campus. Work includes but is not limited to: 1. Demolition and hazardous materials removal. 2. Concrete and steel structure systems. 3. Exterior enclosure systems including: asphalt shingles, metal roof panels, metal wall and soffit panels, fiber-cement siding, polyvinyl chloride (PVC) roofing and associated sheet metal flashing and trim, and roof accessories. 4. Interior improvements including: wall, floor and ceiling finishes. 5. Food service equipment and conveyance systems. 6. HVAC, plumbing and fire protection systems. 7. Power and low' voltage systems. 8. Civil, landscape and irrigation including: earthwork, exterior improvements, and utilities. Work is to be performed in 3 primary phases over 58 months 1. Each phase includes subphases. 2. Each of the three phases shall be substantially complete prior to commencing the next one. Project involves but not limited to: 1. Complex phasing and transitions between phasing. 2. Temporary facilities including but not limited to: a. Utilities. b. Safety and security measures including cameras and fencing. c. Exiting pathways and tunnels and wayfinding signage. 3. Ongoing maintenance and operation of temporary facilities. 4. Work on an occupied site around students, staff and visitors. 5. Need to secure long lead items promptly in order to prevent delaying work. The Owner reserves the right to reject any and all bids, to waive informalities and irregularities in the bidding, and to accept bids which are considered to be in the best interests of the Owner. RESERVED RIGHTS The right is reserved by North Thurston Public. Schools to postpone contract award for the period of forty-five (45) days after the bid opening. North Thurston Public Schools is an Equal Opportunity Employer.

39 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.