Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 19, 2023

December 18, 2023

January 16, 2025

5700 E Nile Ave

Site Work

No Information to Display

$927,853.00

Public - City

img_map_placeholder

5700 E Nile Ave, Manteca, CA

Subscribe to View Full Documents

Furnishing all labor, materials, equipment, and performing all work necessary and incidental to the construction of the project known as the Nile Garden Well 30 Equipping Project according to plans and specifications and according to the contract documents. The Work includes the construction and installation of a potable water well site which includes well pump building, site improvements and fencing, landscaping, irrigation piping and valving, manganese and arsenic treatment systems, pumps, and instrumentation equipment, and approximately 6,500 linear feet of 12-inch pipeline to serve Nile Garden Elementary School. Bid guarantee in an amount not less than ten percent (10%) of the total bid dollar amount and conforming to the prescribed bidding procedures is required to be submitted with each bid, as a guaranty to be forfeited should the bidder, if awarded the contract, fail to enter into the same, or fails to furnish in a timely manner the bonds and/or proof of insurance. Project shall have Substantial Completion with 365 calendar days and Final Completion within 395 calendar days from the date specified in the Notice to Proceed. Time for commencement and completion of the work is important. Time is of the essence in completing contract work in the specified number of calendar days. Any time delays due to chain supply issues will be handled on a case-by-case basis. The successful bidder will be required to furnish a Payment bond in the amount equal to one hundred percent (100%) of the Contract price, as well as a Faithful Performance Bond, in the amount equal to one hundred percent (100%) of the Contract price. All bonds submitted shall be from admitted sureties. The deadline to submit questions is 5:00 p.m. Pacific Standard Time on October 11, 2023. Questions regarding the contract documents shall be submitted in writing to: Attn: Frank Guillory & Kyzen Nicolas City of Manteca Department of Engineering 1001 West Center Street Manteca, CA 95337 email: fguillory@manteca.gov and knicolas@manteca.gov The City reserves the right to reject any or all bids; to make any awards or any rejections in what it alone considers to be in the best interest of the City

23 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.