Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

May 5, 2025

No Information to Display

3320 Garner Rd

New Construction, Site Work

No Information to Display

$81,632,759.00

Public - State/Provincial

img_map_placeholder

3320 Garner Rd, Raleigh, NC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

As of August 21, 2023, an architect and a construction manager has been selected and this project is in the pre-construction/negotiated status. Although a firm timeline for construction has not been determined, construction is expected to start in 2025. *The closed solicitation has been included below for reference: The Department of Public Safety invites experienced design firms to submit qualifications to provide design services for the SBI Headquarter Building and Building 12 Renovation. The project is for a new SBI Headquarters Building at 3320 Garner Rd, Raleigh, NC. The new headquarters building will serve to consolidate several SBI special sections around Raleigh, IT, and other functional groups on the Garner Road Campus into a single building. It is envisioned for the existing headquarters building to remain and be extensively renovated since it is a prominent building of the original campus. The new multi-story headquarters building should join the existing headquarters building and an adjacent building through interior connectors. The project will involve project phasing to allow the demolition and renovation of other structures. A redevelopment master plan has been prepared for the property that estimates the new headquarters building to be at 90,000 square feet. The master redevelopment plan will be provided to the successful firm as background for the advance planning phase. In order to comply with the Performance Standards for Sustainable, Energy-Efficient Public Buildings per Article 8C of GS 143-135.35 to .40, Advance Planning Phase services will be required. Total Project Budget $81,632,759 In order to offer architectural, engineering, or landscape architectural services in response to this solicitation, the proposing firm must be properly licensed to practice Architecture, Engineering, or Landscape Architecture in the State of North Carolina. More information on the North Carolina state boards may be found at the following websites: electronically . E-mail and Fax submittals will not be accepted. The method of contractor selection has not been determined at this time

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.