Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 7, 2023

January 8, 2024

June 8, 2025

4137 Mayfield Rd

Renovation, Site Work

No Information to Display

$2,000,000.00

Public - County

img_map_placeholder

4137 Mayfield Rd, Brampton, ON

Subscribe to View Full Documents

The work is for the Electrical Upgrades for the North Brampton Pumping Station, Project 21-1976. The Contract includes but is not limited to the following work: 1. Adhering to the Agency's communication and public relations strategies 2. Constructing the complete works as specified herein 3. Supply of products as specified 4. Civil - Site preparation - Clearing of the site 5. Earthworks - Tree pruning, and removal - Grading, drainage, sodding and landscaping - Site drainage during the construction period - Temporary works and facilities during the construction period as indicated in Section 1.2.2 above. - Maintaining existing roads used during construction and leaving these roads in as good a condition as they were prior to site work - Piling systems; pile foundations including pile load tests - Performance testing of all equipment and systems provided - Placing the equipment supplied under this Contract into successful continuous operation - Chamber construction - Completion of all inspections, testing, and regulatory approvals 6. Structural - Water tightness testing - Cleaning, flushing, pressure testing and draining - Water quality testing - Cleaning up on completion - Site restoration to existing or better condition - Mechanical systems 7. Electrical - Instrumentation and Control - Refer to Section 016010 Electrical General Requirements - Placing the equipment supplied under this contract into successful continuous operation. - Performance testing of all equipment and systems provided. 8. Cleaning up on completion. 9. Furnishing of materials, equipment, tools, implements, and labour. 10. Heating, ventilation, and air conditioning 11. Odour control 12. Commissioning/pre-commissioning 13. Warranty period Documents may be obtained at https://peelregion.bidsandtenders.ca/ Question Deadline: Tue Oct 31, 2023 12:00:00 PM (EDT)

45 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects