Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
November 22, 2022
August 7, 2023
November 19, 2025
1 Memorial Ave
LEED Certification, New Construction, Site Work
No Information to Display
No Information to Display
Public - Federal
1 Memorial Ave, Arlington, VA
Contract No: W91236-22-C-2022 10/12/2022 - Amendment 0004 Posted. 09/30/2022 - Amendment 0003 Posted. 09/26/2022 - Amendment 0002 Posted. 09/09/2022 - Amendment 0001 Posted. The Southern Expansion project consists of two discrete adjacent construction projects: 1) Phase II Operations Complex and 2) Phase III Cemetery Expansion. For the purpose of this Project, only the Phase II Operations Complex project is to be considered. The Phase III Cemetery Expansion will be awarded under a separate contract at another time. A brief description of work as part of this solicitation is as follows: a. Construction of the Phase II Operations Complex includes an operations building, warehouse building, maintenance building, laydown and storage space, a three-level parking structure (90,000 GSF), landscaping, plantings, an access road to the existing cemetery, and all supporting utilities. Furniture finishes and equipment will be included in the construction contract. LEED Certification of the qualifying buildings is required. b. All facilities must be constructed in accordance with Anti-terrorism/force protection measures and regulation. All construction shall comply with Architectural Barriers Act (ABA) requirements and considerations. Construction within and supporting the program must be of the highest possible quality and workmanship commensurate with ANC s exacting standards and the intent for construction of a forever project. c. Phase II Operations Complex projected construction completion is anticipated in the Spring of 2026. The Southern Expansion project consists of two discrete adjacent construction projects: 1) Phase II Operations Complex and 2) Phase III Cemetery Expansion. For the purpose of this Project, only the Phase II Operations Complex project is to be considered. The Phase III Cemetery Expansion will be awarded under a separate contract at another time. A brief description of work as part of this solicitation is as follows: a. Construction of the Phase II Operations Complex includes an operations building, warehouse building, maintenance building, laydown and storage space, a three-level parking structure (90,000 GSF), landscaping, plantings, an access road to the existing cemetery, and all supporting utilities. Furniture finishes and equipment will be included in the construction contract. LEED Certification of the qualifying buildings is required. b. All facilities must be constructed in accordance with Anti-terrorism/force protection measures and regulation. All construction shall comply with Architectural Barriers Act (ABA) requirements and considerations. Construction within and supporting the program must be of the highest possible quality and workmanship commensurate with ANCs exacting standards and the intent for construction of a forever project. c. Phase II Operations Complex projected construction completion is anticipated in the Spring of 2026. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml solNo=W9123622R2022' to obtain more details.* Project Number: W91236-14-D-0035
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Arlington, VA
Bid Date: Aug 15 2023
Arlington, VA
Bid Date: Sep 08 2023
Arlington, VA
Bid Date: Aug 17 2023
Arlington, VA
Bid Date: Aug 03 2023
Arlington, VA
Bid Date: Aug 02 2023
Arlington, VA
Bid Date: Jul 21 2023
Arlington, VA
Bid Date: Aug 07 2023
Arlington, VA
Bid Date: Jul 25 2023
Bassett, VA
Bid Date: Aug 23 2023
Danville, VA
Bid Date: Aug 07 2023
Manassas, VA
Bid Date: Jun 13 2023
Culpeper, VA
Bid Date: Aug 23 2023
Tappahannock, VA
Bid Date: Aug 29 2023
Rustburg, VA
Bid Date: Aug 15 2023
Suffolk, VA
Bid Date: Jul 13 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
